RT O EP R - cyanidecode.org
The Tarkwa CIL plant was commissioned in October 2004 and utilised a single SAG mill, designed to mill 4.2mtpa (525tph). Through the installation of a Ball Mill, along with additional upstream and downstream equipment, the plant has now be expanded to 12mtpa (1,500tph). Tailings from the plant is deposited on the